Until the drawings of the
dam
and
outlet works.
are
a
little further advanced
I
Schedule A
352
C. O.
12160
RECR
REGP
Approximate Estimate of rock fe52 Machinery required for the Lytam Tunnel Hong Kong Water works.
4 Wathorne's patent rock drills @ £44. Hy ditto dilte ditto for reserve use 44 Columns or standards (hydraulic) @ £21 2 ditto for reserve
woe
2 Air compressors D £250 212. PP steam boilers
0
£300.0.0
300.0
24
0 0
42
Ο 0
L
500
£125
250.
**
0
shall not be able to state whal
2. Air receivers a £85
190
0
h
Portland Cement
-
0 0
A
quantity of
will be required but I will
furnish you this information
very shortly. Meanwhile
arr
as
be made,
angements may independently, for procuring the
#
plant set forth in Schedules t
and B I lose no
time
ins
transmitting you
I have, the,
These enclosures.
Robert Rawlinson
x Sie
24 doyen drill bits a £6 3 sets
of suages for sharpening bits d£1.1.0 400 feel of flexible air hose a) 3/6 2500 yards of 2 iuch iron piping a 3⁄4 16 pairs of hose couplings a 16/ 4 hundred feet of 1/2 much water hose
of
3 3 0
70.0 O 375.0.0 /2 6 0
"
23 6
+
H
30 0
0
+
2 Air Compressing water vessels d£15 2500 yards of such iron water piping @ gl-14-6 Fittings for coupling up
boiler and receiver cocks Is bends reducing sochets the, say Duplicate parts of rock drills, air compressors
Jor
reserve use in case of need, say
Packing and shipping, say,
Total
15.0
0
bo.
£ 2406 « 12 « 0
100. 0 0
X Y
€2586.6
Aste. A percentage should be deducted from The above prices by the makers.